Construction of 700.00 mts. of pluvial
colector “Nuevo Laredo”, in the location of Tulpetlac,
borough of Ecatepec, Edo. de México
Whit pipes of reinforced concrete of 2.13 mts. of diameter by
sinked method of pipes hidromechanic shove and digge with mecanic
shield of open front of lattire and digger, and construction
of luminary to profile base AZ tongue and groove to public works
direction of borough of Ecatepec, through asociation agreement
in colaboration with Contratista National Company, S.A. de C.V.
Construction of 167.00 mts. pluvial
Colector “Nuevo Laredo”, in the location of Tulpetlac,
borough of Ecatepec , Edo. de México.
Whit reinforced concrete pipes of 2.13 mts. of diameter fon
sinked melhod by hidromechanic shove and digge whit mecanic
shield of open front of lattire and construction of tongue and
goove to profile base AZ to public works direction of borough
of Ecatepec, by sub agreement whith Contratistas Unidos Mexicanos,
S.A. de C.V. |
|
 |