|
|
| |
 |
 |
Construction of the tunnel of 220 cm
(86") diameter,using concrete reinforced pipe sunk 183
cm nominal diameter with hidro-mechanic push, with a longitude
of 606 mt and light-shaft construction with machiembrado profile,
for collector in San José Tláhuac
with an execution period from August 09th to December
07th 1999.
|
|
 |
sewerage, shields, pipe, tunnels, microtunnels, sheet piling, tube, driving, openings, recondition, drainage, thrust, cofferdams, collector, drilling, excavation