BENITO JUAREZ DELEGATION, MEXICO, D.F.


YEAR 2002

Piping restitution project due to failure (rupture) on the right and left pipes of the Viaducto Rio Becerra collector, which consisted of 100.00 M length of 48” diameter piping made from polyester resin mortar and re-enforced with fiberglass and annular space padding.



CUAUHTEMOC DELEGATION


YEAR 2000



Integral Project

(research, field studies, design, hydraulic, arquitectural, structural, and efficiency projects) including construction projects necessary to repair the 2.13 M diameter collector located in the Calle de Heroes Street, in the intersection with Eje 1 Norte (Mosqueta Ave.), Cuauhtemoc Delegation. The project was necessary due to the construction of the metropolitan “B” Line (subway), Buenavista-Ciudad Azteca.





sewerage, shields, pipe, tunnels, microtunnels, sheet piling, tube, driving, openings, recondition, drainage, thrust, cofferdams, collector, drilling, excavation