Integral Project
(research, field studies, design, hydraulic, arquitectural, structural,
and efficiency projects) including construction projects necessary
to repair the 2.13 M diameter collector located in the Calle de
Heroes Street, in the intersection with Eje 1 Norte (Mosqueta Ave.),
Cuauhtemoc Delegation. The project was necessary due to the construction
of the metropolitan “B” Line (subway), Buenavista-Ciudad
Azteca. |