IZTAPALAPA

YEAR 1999

Construction indeco 11 collector with a longitude of 1,543.83 mts. of 2.44 mts.interior and reception in the light-shaft 5 of the semi-deep collector on Iztapalapa of this city.With sunk pipe method with hidro-mechanic push and excavation with mechanic front shield open grills, and light-shaft construction with machiembrado profile.


YEAR 2000

Construction of tunnel 1.52 m interior of plumbling plant Exercises from East of iztapalapa Laguna menor it includes: the reception and discharge with the help of steel pipe to the coal (astm to-285-c) of 1.52 m of and of 19 mm of thickness as well as the construction of the thatched top perimetral of the plant exercises of east located in the cabbage. I exercise of east deleg. iztapalapa, for the method of having sunk of pipe by hidromechanic push and light-shaft construcoon with machiembrado profile.

sewerage, shields, pipe, tunnels, microtunnels, sheet piling, tube, driving, openings, recondition, drainage, thrust, cofferdams, collector, drilling, excavation