In the installation of drinking water and
drainage piping for any project that we perform, we account for
interference in the pipe tracing, which leads us to work with
drinking water piping which in turn becomes a project involving
6”,12”, 24” and 48” piping made of either
steel or asbestos.
Due to the fact that different material elements are combined
to make fresh water piping, it is necessary for all the components
used in its construction to be of verifiable quality backed by
specifications that: a) guarantee the useful life of its components
and; b) prevent the waste or contamination of the drinking water.
That is the MICROTUNEL chronology.
DRINKING WATER, NEW PROJECT REHABILITATED THROUGH EITHER SUBSTITUTION
OR BREAKAGE