DRINKING WATER

CONSTRUCTION

In the installation of drinking water and drainage piping for any project that we perform, we account for interference in the pipe tracing, which leads us to work with drinking water piping which in turn becomes a project involving 6”,12”, 24” and 48” piping made of either steel or asbestos.

 
Due to the fact that different material elements are combined to make fresh water piping, it is necessary for all the components used in its construction to be of verifiable quality backed by specifications that: a) guarantee the useful life of its components and; b) prevent the waste or contamination of the drinking water. That is the MICROTUNEL chronology.



DRINKING WATER, NEW PROJECT REHABILITATED THROUGH EITHER SUBSTITUTION OR BREAKAGE









sewerage, shields, pipe, tunnels, microtunnels, sheet piling, tube, driving, openings, recondition, drainage, thrust, cofferdams, collector, drilling, excavation