Construction of a semi-profound collector including complementary
projects at the Mexico City International Airport.
Construction was carried out with a 1.83
m diameter pipe with a length of 89.42 m utilizing the hydro-mechanical
pipe-jacking (pipe driving) method. Excavation was done with
a mechanical open front shield. Skylight port constructed with
AZ profile tongue and groove, and a Milan walled pumping reservoir.
Projects were done for the Mexico City International Airport.
Contracted work completed before schedule.