- Construcción de colector
semiprofundo y obras complementarias en el Aeropuerto Internacional
de la Ciudad de México.
Construction was carried out with a 1.83 m diameter pipe with
a length of 89.42 m utilizing the hydro-mechanical pipe-jacking
(pipe driving) method. Excavation was done with a mechanical
open front shield. Skylight port constructed with AZ profile
tongue and groove, and a Milan walled pumping reservoir. Projects
were done for the Mexico City International Airport. Contracted
work completed before schedule.
- Pipe instalation at the drainpipe
mother I. With a concrete pipe of 1.83 diameter mts. and lenght
of 450 mts. by the digging method of pipe through
an hydromechanical thrust and front excavation with a mechanical
open grill shield, port construction based in AZ profile joined
with tongue and groove. Works make for CCC Consoricio Industrial
S.A. de C.V..
- Pipe instalation at the drainpipe
mother III and IV with a concrete pipe of 1.83, 1.22 and 1.52
diameter mts. in a lenght of 450 mts. by the digging
method of pipe through an hydromechanical thrust, front excavation
with a mechanical open grill shield, port construction based
in AZ joined with tongue and groove. Works executed for CCC
Consorcio Industrial S.A. de C.V.
- Canal construction among the drain
canal of water circulation system of the Central old fogy
pump of the CCC Rosarito III in the Baja Califormia stare
for the Federal Comission of Electicity.
- Restitution works of pipe caused
by a borken in the right and left pipes of the drainpipe Viaducto
Rio Becerra with a resin mortar pipe of reforced
polyester and FIBRA DE VIDRIO of 48” diameters with
.
|
|
 |